background image

Lead training

 

Cantilever Strength of Assembly: Sufficient to support 

one 500 MCM or 240 mm

2

 Cu lead per contact.

 

Switch contacts are pre-gauged at factory and will have 

some rotation in same plane as switch blade. Leads 

attached to switch contacts must not restrict this 

rotation. The nuts holding the contacts should not be 

tightened. Leads can be bolted to rear of contact and 

care should be taken to minimize mechanical stress on 

the contacts. Standard dielectric dimensions for lead 

separation should be followed. Tight lead training may 

cause excess cantilever force and difficulty in switch 

operation.

Figure 6. Arc clearance zone.

Figure 7. View of tank front with optional limit plate 

positioned over pin.

Note: 

With limit plate positioned securely as shown, switch can be operated only

counterclockwise to “line A only” position and no further.

OPEN

LINE A

ONLY

LINES 

A & B

LINE B

ONLY

WELD PINS (4)

(FOR 

POSITIONING

LIMIT PLATE)

CAUTION 

This illustrated decal in Figure 7 is typical of some 

V-blade switches only. See Table 6 for other switch 

layouts and schematics. 

ARC CLEARANCE ZONE

ARC CLEARANCE ZONE

3.50" (89 mm) 

MINIMUM

1.75" (45 mm) 

MINIMUM

7.0" (178 mm) RADIUS 

ALL AROUND

(FRONT VIEW)

7

SECTIONALIZING SWITCH INSTALLATION INSTRUCTIONS

  MN800002EN   March 2016

Summary of Contents for COOPER POWER LS4R Series

Page 1: ...Sectionalizing switch installation instructions COOPER POWER SERIES OEM Equipment MN800002EN Effective March 2016 Supersedes June 2015...

Page 2: ...IN ANY EXISTING CONTRACT BETWEEN THE PARTIES ANY SUCH CONTRACT STATES THE ENTIRE OBLIGATION OF EATON THE CONTENTS OF THIS DOCUMENT SHALL NOT BECOME PART OF OR MODIFY ANY CONTRACT BETWEEN THE PARTIES...

Page 3: ...Std C37 71 2001 standard 2 Ratings and characteristics table per IEC 60265 1 2 Dimensional information 2 INSTALLATION PROCEDURE Bolt In assembly 4 Ring Mount assembly 5 Connect internal leads 6 RECOM...

Page 4: ...n Safety information DANGER Hazardous voltage Contact with hazardous voltage will cause death or severe personal injury Follow all locally approved safety procedures when working around high and low v...

Page 5: ...aded activating mechanism ensures quick loadbreak action and positive contact engagement through all positions The Make Before Break MBB switches provide uninterrupted power during switching Read this...

Page 6: ...n phases kV 95 125 150 Across open contacts kV 95 125 150 Power Frequency 1 minute To ground and between phases kV 35 60 70 Across open contacts kV 35 60 70 DC Withstand 15 minutes To ground and betwe...

Page 7: ...n be used on 14 gauge 075 inch 1 9 mm to 25 inch 6 4 mm thick frontplate 14 gauge shown 3 Optional padlock handle is available See catalog section CA800005EN Table 6 and Figure 6 4 See catalog section...

Page 8: ...ng is accomplished with O rings on the operating shaft and gasketed sealing gland secured on the outside of the tank with locking nut 5 Optional install spring small end toward end of shaft and limit...

Page 9: ...ance zone and have an insulated barrier between them and the switch This barrier will deflect any gas bubbles generated by the switch operation The outline drawing shown in Figure 6 describes the swit...

Page 10: ...B A A A A COIL B C COIL C COIL V BLADE MAKE BEFORE BREAK A C B A C B A C B A C B AB C B C OPEN A C LINES A B TO C LINE A ONLY LINE B ONLY TO C TO C OPEN ALL B A C COIL T BLADE BREAK BEFORE MAKE A C B...

Page 11: ...d training may cause excess cantilever force and difficulty in switch operation Figure 6 Arc clearance zone Figure 7 View of tank front with optional limit plate positioned over pin Note With limit pl...

Page 12: ...next position could jam the mechanism making the switch inoperable If the handle stops jams in a position between the designated marked positions stop switching operation and consult the factory prio...

Page 13: ...adbreak devices Failure to follow this warning could result in equipment damage severe injury or death WARNING Hazardous voltage Do not operate loadbreak equipment if a fault condition is suspected Do...

Page 14: ...This page is intentionally left blank 10 SECTIONALIZING SWITCH INSTALLATION INSTRUCTIONS MN800002EN March 2016...

Page 15: ...This page is intentionally left blank 11 SECTIONALIZING SWITCH INSTALLATION INSTRUCTIONS MN800002EN March 2016...

Page 16: ...es Eaton com cooperpowerseries 2016 Eaton All Rights Reserved Printed in USA Publication No MN800002EN Rev 01 Supersedes MN800002EN Rev 00 SAFETY FOR LIFE Eaton is a registered trademark All trademark...

Reviews: