INSTALLATION
EATON
9130 (9910-E15/E16) UPS Installation Guide for IBM
®
Applications
S
164201783 Rev 2
9
Wiring Installation
This section explains:
S
Installing the UPS, including connecting the UPS internal batteries
S
Connecting any optional EBMs
Installing the UPS
NOTE
Do not make unauthorized changes to the UPS; otherwise, damage may occur to
your equipment and void your warranty.
NOTE
Do not connect the UPS power cord to utility until after installation is completed.
To install the UPS:
1.
Remove the UPS front cover (see Figure 1).
To remove the cover, push down on the top of the cover and pull
the cover toward you to unclip it from the cabinet.
NOTE
A ribbon cable connects the LCD control panel to the UPS. Do not pull on the cable
or disconnect it.
NOTE Leave
ribbon cable
connected.
Figure 1. Removing the UPS Front Cover
Summary of Contents for 9910-E16
Page 2: ...This page intentionally left blank ...
Page 3: ...Eaton 9130 9910 E15 E16 UPS Installation Guide for IBM Applications ...
Page 31: ...Eaton 9130 9910 E15 E16 UPS Asennusopas IBM sovelluksille ...
Page 60: ...Onduleur 9910 E15 E16 Eaton 9130 Guide d Installation pour Applications IBM ...
Page 91: ...Eaton 9130 9910 E15 E16 USV Installationshandbuch für IBM Anwendungen ...
Page 120: ...UPS Eaton 9130 9910 E15 E16 Guida all installazione per applicazioni IBM ...
Page 149: ...Zasilacz UPS Eaton 9130 9910 E15 E16 Instrukcja instalowania dla zastosowań IBM ...
Page 182: ...ИБП Eaton 9130 9910 E15 E16 Руководство по установке в системах IBM ...
Page 215: ...SAI Eaton 9130 9910 E15 E16 Guía de instalación para aplicaciones IBM ...
Page 244: ...Eaton 9130 9910 E15 E16 UPS Installationshandledning för IBM applikationer ...