INSTALLATION
EATON
9130 (9910-E15/E16) UPS Installation Guide for IBM
®
Applications
S
164201783 Rev 2
10
C
A
U
T
I
O
N
A small amount of arcing may occur when connecting the internal batteries. This is normal
and will not harm personnel. Connect the cables quickly and firmly.
2.
Connect the internal battery connector (see Figure 2).
Connect the white connectors together, connecting red to red, and
black to black. Press the two parts tightly together to ensure a
proper connection.
Figure 2. Connecting the UPS Internal Batteries
3.
Remove the two screws from the screw mounts and retain (see
Figure 2).
4.
Place the battery connector between the screw mounts. Reinstall
the two screws to hold the connector in place.
5.
Replace the UPS front cover.
To replace the cover, verify that the ribbon cable is protected, then
insert the clips on the back of the cover into the cabinet and push
firmly to snap the cover into place.
Summary of Contents for 9910-E16
Page 2: ...This page intentionally left blank ...
Page 3: ...Eaton 9130 9910 E15 E16 UPS Installation Guide for IBM Applications ...
Page 31: ...Eaton 9130 9910 E15 E16 UPS Asennusopas IBM sovelluksille ...
Page 60: ...Onduleur 9910 E15 E16 Eaton 9130 Guide d Installation pour Applications IBM ...
Page 91: ...Eaton 9130 9910 E15 E16 USV Installationshandbuch für IBM Anwendungen ...
Page 120: ...UPS Eaton 9130 9910 E15 E16 Guida all installazione per applicazioni IBM ...
Page 149: ...Zasilacz UPS Eaton 9130 9910 E15 E16 Instrukcja instalowania dla zastosowań IBM ...
Page 182: ...ИБП Eaton 9130 9910 E15 E16 Руководство по установке в системах IBM ...
Page 215: ...SAI Eaton 9130 9910 E15 E16 Guía de instalación para aplicaciones IBM ...
Page 244: ...Eaton 9130 9910 E15 E16 UPS Installationshandledning för IBM applikationer ...