Use the following basic sequence of steps to install the UPS:
1.
Create an installation plan for the UPS system (Section
3.1 Creating an Installation Plan
).
2.
Prepare your site for the UPS system (Section
3.2 Preparing the Site
).
3.
Inspect and unpack the UPS cabinet (Section
3.3 Inspecting and Unpacking the UPS Cabinets
).
4.
Unload and install the UPS cabinet, and wire the system (
Chapter 4 UPS System Installation
).
5.
Complete the Installation Checklist (Section
4.9 Completing the Installation Checklist
).
6.
Have authorized service personnel perform preliminary operational checks and start up the system.
NOTE
Startup and operational checks must be performed by an authorized Eaton Customer
Service Engineer, or the warranty terms specified in
become void.
This service is offered as part of the sales contract for the UPS. Contact an Eaton service
representative in advance (a minimum two-week notice is required) to reserve a
preferred startup date.
33..11
C
Crreeaattiinngg aann IInnssttaallllaattiioonn P
Pllaann
Before installing the UPS system, read and understand how this manual applies to the system being installed.
Use the procedures and illustrations in this chapter, UPS Installation Plan and Unpacking and Chapter 4 UPS
System Installation to create a logical plan for installing the system.
33..22
P
Prreeppaarriinngg tthhee S
Siittee
For the UPS system to operate at peak efficiency, the installation site should meet the environmental
parameters outlined in this manual. The operating environment must meet the weight, clearance, and
environmental requirements specified.
33..22..11
EEnnvviirroonnm
meennttaall aanndd IInnssttaallllaattiioonn C
Coonnssiiddeerraattiioonnss
The UPS system installation must meet the following guidelines:
•
The system must be installed on a level floor suitable for computer or electronic equipment.
•
The system must be operated at an altitude no higher than 1500m (5000 ft) without derating. For additional
assistance with high altitude operation, contact an Eaton service representative (see paragraph
•
The system must be installed in a temperature and humidity controlled indoor area free of conductive
contaminants.
•
The environmental requirements specified below are for the air at the intake ports of the 93PM UPS, and
are the maximum, not to exceed, ratings.
–
There shall be at least a 1.8°F (1.0°C) difference between the dry bulb temperature and the wet bulb
temperature, at all times, to maintain a non-condensing environment.
–
The maximum rate of temperature change shall be limited to 3°F over 5 minutes (36°F/hour), based on
the ASHRAE Standard 90.1-2013.
•
The newer, more energy efficient data center cooling methods (such as air side economization) can create
much wider ranges of temperature and Relative Humidity (RH) in the UPS room and/or data center. There
are two aspects of this increased operating environment that can, if ignored, create issues.