Eaton 93E External Battery Cabinet Installation Manual P-164000057—Rev 05
31
Figure 17. EBC Power Terminal Cover Base Installation and Conduit Wire Entry Location
Power Terminal Cover
Base Installed
Conduit Landing for DC Input and
Output when using conduit
(Install conduit to bottom of base.)
93E 30EBC
NOTE
The 93E 30EBC is shown. However, the 93E 60EBC
installation is the identical.
44..44
IInnssttaalllliinngg EEB
BC
C EExxtteerrnnaall P
Poow
weerr W
Wiirriinngg
NOTE
Wiring can be installed using conduit between cabinets or by routing wiring through the
power terminal cover base wiring channels.
To install wiring to connections:
1.
If installing wiring using conduit, proceed to
; if using the power terminal cover base channels,
proceed to
.
2.
Punch or drill holes in the bottom of the power terminal cover base on the UPS cabinet for the DC input
conduit. Refer to the applicable Eaton 93E UPS Installation and Operation manual listed in paragraph
for UPS cabinet conduit landing location.