Operation
Eaton 9315/9390/9395/9395P Fixed Primary Sync Control Installation and Operation Manual P-164000023—Rev 03
4-3
4.3
Operation
Perform the following procedure to set up the Eaton Fixed Primary Sync Control for operation with your system.
See Figure 4-2 and Table 41 Table 3-7 for the location and explanation of the controls and indicators on the
Eaton Fixed Primary Sync Control.
1.
Place the secondary system in normal operating mode. Refer to the applicable UPS installation and
operation manual listed in paragraph 1.3 on page 1-4.
2.
Press the LAMP TEST pushbutton to verify all indicators illuminate and are working correctly.
3.
Depress the LOAD SYNC ENABLE pushbutton switch to enable the automatic synchronization control.
The pushbutton illuminates when the synchronization control is activated.
4.
To disable the automatic synchronization control, depress the LOAD SYNC ENABLE switch and verify the
LOAD SYNC ENABLE pushbutton is extinguished.
Figure 4-2. Eaton Fixed Primary Sync Control Controls and Indicators
1
2
3
4
5
LAMP TEST
LIT WHEN ENABLED
DEPRESS TO ENABLE/DISABLE
LOAD SYNC ENABLE
ON BYPASS
SYNCHRONIZED TO PRIMARY SOURCE
SYNCHRONIZED TO OWN BYPASS
UPS SYSTEM
Summary of Contents for 9315P
Page 1: ...Eaton 9315 9390 9395 9395P Fixed Primary Sync Control Installation and Operation Manual...
Page 2: ......
Page 3: ...Eaton 9315 9390 9395 9395P Fixed Primary Sync Control Installation and Operation Manual...
Page 8: ...This page intentionally left blank...
Page 61: ......
Page 62: ...P 164000023 2 P 164000023 3...