Figure 15. Line illustration of grounding.
GROUNDING
TABS
GROUNDING
TAB
Step 11
Ground system
•
Connect drain wire on insulated protective cap to system
ground.
•
Connect drain wire to LRTP grounding tab and shroud
grounding tab.
•
Connect drain wire to PUSH-OP body grounding tab and
shroud grounding tab.
•
Connect one strand of cable concentric neutral to shroud
grounding tab. Connect remainder of concentric neutral
wires to system ground. (Refer to Figure 15.)
7
600 A 15/25 KV CLASS PUSH-OP DEADBREAK CONNECTOR INSTALLATION INSTRUCTIONS
MN650057EN May 2017