Page 12
614-07977-00_EN
3. Installation
3.2 Installation in tower position
Note.
The two supports for the tower position are used on the RT 2U version only.
3.3 Installation in rack position
Follow steps 1 to 4 for module mounting on the rails.
1
1
3
4
4
3
2
The rails and necessary hardware are supplied by EATON.