17
Instruction Book IB182312EN June 2016 www.eaton.com
50/75/150 VCP-W
Selectable Ground and Test Device
Figure 5.11. SG&T Device In Connect Position
Figure 5.12. Removing SG&T using Lift / Pull Handle
To remove the SG&T from the cell, install the extension guide rails.
Pull up on the Lift/Pull Handle as shown in Figure 5.12 then pull the
device out onto the extension rails. Use a lifting yoke and overhead
lifter to remove the SG&T from the extension rails.