12. ANCILLARY SERVICE CONNECTIONS
Figure 11.1 – Condensate Services
←
→
↑
12.1 Condensate Removal
As standard the condensate is removed by gravity drainage on the bottom of the unit.
12.2 Condensate Connection
A plastic hose connector is supplied loose (to be found inside electrical section) with the unit for site
fitting of the condensate tray. In order to fit the connector it is necessary to remove the drain tray (1).
The tray is removed by undoing the two-off screw fittings (2) and the four front screw fixings (3). After
fitting the connector re-fit the condensate tray.
Note:
After installation, pour 2 litres of water into drain tray and check for good drainage.
SPECIAL NOTE
ENSURE ALL CONNECTIONS EXTERNAL TO THE UNIT CASING AND DRAIN PIPEWORK ARE ADEQUATELY
INSULATED TO PREVENT FREEZING OR CONDENSATION.