1
08
FURNACE PREPARATION FO USE
Before installation, you should test-light the furnace outdoors for 4-5 hours. During the first
burning, all technical components (dirt, occupational dust and so on), which got on the furnace
during the transportation and warehouse or production storage, will burn out.
Before putting the furnace into exploitation, make sure that all installation works were
completed according to the requirements of this manual or to instructions for constituent parts made
by other supplier!
Furnace and chimney should be regularly checked. In case if there is any malfunction of the
equipment, you should immediately stop exploiting the furnace and contact our specialists to
get a troubleshooting assistance on a possible cause of this failure and remedial procedures to fix
it.
Our main chimneys are made of stainless heat-resistant steel AISI 316 (310, 321) with wall thickness
not less than 0.8 mm in the brick or stone cover which is fixated with a decorative sheet
(economizer).
The minimum distance between the cover and inflammable surfaces is 500 mm.
The protective heat-resisting shield in the front of the furnace should be as high as the full height
of the room (pic. 4).
When developing your banyas' project and installing the furnace, it is NECESSARY to ensure that
all fire safety standards mentioned in the Code of Practice (CP) 112.13330.2011* “Fire safety of
buildings and facilities” and CP 7.13130.2013 “Heating, ventilation and conditioning. Fire safety
requirements. With Amendment No.1 & Amendment No.2” are met. Non-compliance with safety
standards can cause a fire.
The pass-through in floors and in the roof should be made fire-proofed according to the CP
7.13130.2013.
The floor in front of the door should be covered with a metal sheet in size of 700*500 mm in
order to shield it from the combustible materials.
Combined extract-and-input ventilation is installed in the sweating room to insure good
ventilation.
In the far corner away from the furnace, there is should be a small window under the ceiling
to remove the carbon dioxide accumulated during the respiration.
While in operation the furnace has a thermal expansion of 3-5 mm. This should be taken into
account in the process of installation.
It is prohibited to place the flue channel of the furnace outside. The furnace cannot be lighted up
from the outdoors.