
3.1 Start-Up Instructions (cont.)
Connect unit to a source of clean water 30-90psi. (Optional)
Verify that the System is Operational
Once the system is fully assembled, check to make sure it is operational and
ready to use:
1.
Make sure that the pressure vessel vent valve is closed.
2.
Place the Air Safety Lockout Valve open. (next to regulator) Up position.