20 Operation
Main Power
To begin operation turn, the “Main Switch” to the “ON”
position. The “Main Switch” controls power for both the
tunnel and sealer.
Conveyor and Blower
Press the Conveyor and Blower “ON” (green button) to start the conveyor
and blower in the heat tunnel.
To turn the conveyor and blower off press the red Conveyor and Blower
“OFF” button.
Tunnel Heater
Turn the tunnel Heater Switch to the “ON” position.
Summary of Contents for VS1620
Page 1: ...VS1620 L Sealer Heat Tunnel Combo Value Series User Guide...
Page 2: ......
Page 4: ......
Page 36: ...36 Parts List VS1620 L Sealer Tunnel Combo Unit Main Assembly...
Page 46: ...46 Parts List Heat Tunnel Hood Assembly VSTA0066 VS1620DC...
Page 48: ...48 Parts List L Sealer And Frame VSSA0259 VS1620E...
Page 53: ...Parts List 53 L Sealer Takeaway Conveyor VSSA0261 LTS504B P...
Page 65: ......
Page 66: ......