Installation and Set Up 17
Aligning the Shrink Tunnel
When the film, product tray and product are correctly aligned, release the red lever
stopper and position the entire sealer and product tray assemblies in line with the shrink
tunnel opening centering the product down the center of the tunnel. Reset the red lever
stopper to lock the sealer assembly in position.
Red Lever
Stopper
Shrink
Tunnel
Opening
Sealer and
Product Tray
Assemblies
Summary of Contents for VS1620
Page 1: ...VS1620 L Sealer Heat Tunnel Combo Value Series User Guide...
Page 2: ......
Page 4: ......
Page 36: ...36 Parts List VS1620 L Sealer Tunnel Combo Unit Main Assembly...
Page 46: ...46 Parts List Heat Tunnel Hood Assembly VSTA0066 VS1620DC...
Page 48: ...48 Parts List L Sealer And Frame VSSA0259 VS1620E...
Page 53: ...Parts List 53 L Sealer Takeaway Conveyor VSSA0261 LTS504B P...
Page 65: ......
Page 66: ......