26 Maintenance
Maintenance
The Eastey L-Bar Sealer Tunnel Combo machine will provide many hours of
maintenance-free operation and requires very little maintenance for normal operation.
There are a few items that may require attention from time to time.
Attention!
Any maintenance beyond normal cleaning and lubrication
should only be performed by trained and qualified personnel.
Sealer
Daily
Clean the seal band.
Ensure the
PTFE
tape is not torn or missing on upper and lower seal areas.
Replace as needed.
Check conveyor belt for tears.
Check the conveyor height adjustment wheel. Lubricate chain and screws as
needed.
Check power cord and wiring for wear and loose connections.
Check for loose fasteners.
Shrink Tunnel
Daily
Inspect the silicone rollers. Repair or replace as needed.
Check mesh belt for material stuck on or in belt. Clean if necessary.
Monthly
Check and clean the air intake screens.
Check the airflow holes inside the tunnel for debris and clean if necessary.
Check and adjust the conveyor tension.
Lubricate the drive chains.
Summary of Contents for VS1620
Page 1: ...VS1620 L Sealer Heat Tunnel Combo Value Series User Guide...
Page 2: ......
Page 4: ......
Page 36: ...36 Parts List VS1620 L Sealer Tunnel Combo Unit Main Assembly...
Page 46: ...46 Parts List Heat Tunnel Hood Assembly VSTA0066 VS1620DC...
Page 48: ...48 Parts List L Sealer And Frame VSSA0259 VS1620E...
Page 53: ...Parts List 53 L Sealer Takeaway Conveyor VSSA0261 LTS504B P...
Page 65: ......
Page 66: ......