20 Operation
Main Power
To begin operation, turn the Main Switch to the ON
position.
The Main Switch controls power to both the tunnel and
sealer.
Conveyor and Blower
Press the Conveyor and Blower ON (green button) to start the conveyor and
blower in the heat tunnel.
To turn the conveyor and blower off press the red Conveyor and Blower
OFF button.
Tunnel Heater
Turn the tunnel Heater switch to the ON position.
Summary of Contents for Value VS1620TK
Page 1: ...VS1620TK Hot Knife L Sealer Tunnel Combo Value Series User Guide ...
Page 2: ......
Page 4: ......
Page 66: ......
Page 67: ......