Installation and Set Up 15
The pin perforation wheel punches small holes in the shrink wrap to allow air to
evacuate while in the shrink tunnel. Loosen the pin perforation adjustment knobs at
each end of the perforating wheel roller and move the perforation rollers away from the
rubber roller. Position the pin perforation rollers according to the product size. After
threading the film move the perforating wheels back to the operating position (against
the rubber roller) and retighten the pin perforation adjustment knobs.
The product tray position is adjustable. Loosen the product tray adjustment knob and
align the product tray with the center fold edge of the shrink film. Retighten the
adjustment knob.
Film and Product Alignment Diagram
Film Core
Thumb Screw
Locking Knobs
Pin
Perforation
Adjustment
Knobs
Shrink Film
Roller
Product Tray
Adjustment Knob
Pin
Perforation
Adjustment
Knob
Pinwheel
Perforation
Rollers
Perforation
Pinwheels
Product Tray
Film Core
Retaining Collar
Film Core
Retaining Collar
Operator
Side
End of
Tray
Summary of Contents for Value VS1620TK
Page 1: ...VS1620TK Hot Knife L Sealer Tunnel Combo Value Series User Guide ...
Page 2: ......
Page 4: ......
Page 66: ......
Page 67: ......