26 Maintenance
Maintenance
The Eastey Hot-Knife L-Sealer and Heat Tunnel Combo will provide many hours of
maintenance-free operation and requires very little maintenance for normal operation.
There are a few items that may require attention from time to time.
Attention!
Any maintenance beyond normal cleaning and lubrication
should only be performed by trained and qualified personnel.
Sealer
Daily
Clean the hot knife seal blade. Check the upper and lower seal areas for melted or
scrap film or dirt and clean as required.
Ensure no parts are broken or missing from the upper and lower seal areas.
Replace as needed.
Check conveyor belts for wear or damage. Check the takeaway conveyor for torn
belt or excessive wear; check the tunnel conveyor for worn or broken parts. Repair
or replace as needed.
Check the conveyor height adjustment wheel. Lubricate chain and screws as
needed.
Check power cord and wiring for wear and loose connections.
Check for loose fasteners.
Shrink Tunnel
Daily
Inspect the silicone rollers. Repair or replace as needed.
Check mesh belt for material stuck on or in belt. Clean if necessary.
Monthly
Check and clean the air intake screens.
Check the airflow holes inside the tunnel for debris and clean if necessary.
Check and adjust the conveyor tension.
Lubricate the drive chains.
Summary of Contents for Value VS1620TK
Page 1: ...VS1620TK Hot Knife L Sealer Tunnel Combo Value Series User Guide ...
Page 2: ......
Page 4: ......
Page 66: ......
Page 67: ......