12 Installation and Set Up
Installation and Set Up
Unpacking
Carefully unpack the Eastey Hot-Knife L-Sealer and Heat Tunnel Combo unit from the
shipping carton.
Remove the shipping bolts and straps that secure the L-Sealer and Heat Tunnel Combo
unit to the shipping pallet. Remove the product tray and lift the L-Sealer and Heat
Tunnel Combo unit off the pallet.
Attention!
The Eastey L-Sealer and Tunnel Combo is a very heavy
piece of equipment and will require a forklift or several
people to move safely off the shipping pallet.
For shipping purposes, the product tray has been disassembled from the L-Sealer.
Assembly
The Eastey VS1620TK Hot-Knife L-Sealer and Heat Tunnel unit has been assembled at
the factory and requires very little assembly.
Product Tray
The product tray contains both the film roller and the perforating pinwheel. The product
tray has been disassembled from the sealer for shipping. There are four (4) bolts that
are used to mount the product tray. Use the provided hardware to attach the product
tray to the infeed end of the L-sealer.
Hot-Knife
L-Sealer
Section
Product
Tray
Heat Tunnel
Section
Summary of Contents for Value VS1620TK
Page 1: ...VS1620TK Hot Knife L Sealer Tunnel Combo Value Series User Guide ...
Page 2: ......
Page 4: ......
Page 66: ......
Page 67: ......