![background image](http://html1.mh-extra.com/html/eastern-jungle-gym/bottom-playhouse/bottom-playhouse_assembly-instructions-manual_3459355009.webp)
NOTE: The counter
sink holes in GSI2455
should face the inside
of box. The counter
sink holes on FJ2455
should face outside of
box.
Step #2-Ground Support Base Bottom Playhouse
Begin by laying out (2)- FJ2455 and (2)-GSI2455 as shown in drawing. Measure
3 ½” from end of FJ2455. Using a B4 lag bolt, bolt the pieces together.
Measure from corner to corner on
each side of ground support base.
Make sure your measurements are
the same. This will square of base.
Step #1-Teak Removal Bottom Playhouse
Unbolt and remove all four PT246
from under floor base. Discard
teaks they are no longer needed.
Summary of Contents for BOTTOM PLAYHOUSE
Page 1: ...Owners Instruction Manual...
Page 2: ......
Page 3: ......
Page 4: ......
Page 5: ...Accessories Identification 1 Roll of electrical tape...
Page 6: ...Hardware Identification...
Page 7: ......
Page 8: ...Wood and Kit Identification Bottom Playhouse 1 2 INNER TREEHOUSE WALL KIT PART WK55...
Page 15: ......
Page 16: ......
Page 17: ......
Page 18: ......
Page 19: ...Owners Instruction Manual...
Page 20: ......
Page 21: ......
Page 22: ......
Page 23: ...Accessories Identification 1 Roll of electrical tape...
Page 24: ...Hardware Identification...
Page 25: ......
Page 26: ...Wood and Kit Identification Sky Bottom Playhouse 1 2 INNER TREEHOUSE WALL KIT PART WK55...
Page 34: ......
Page 35: ......
Page 36: ......
Page 37: ......