![background image](http://html1.mh-extra.com/html/eastern-jungle-gym/bottom-playhouse/bottom-playhouse_assembly-instructions-manual_3459355012.webp)
Step #6-Inner Wall Countersink Bottom Playhouse
Counter sink holes on the backside
of inner WK55 using 7/8” drill bit.
Step #5 Outer Wall Kit Install
Bottom Playhouse
Install WK55 flush with top of
upper GSI2455. Bolt in place using
B4 bolts.
Note: If ground is unlevel there
will be a gap between the
bottom playhouse floor and
the ground supports. This is
normal as the ground supports
flow with the grade of the
property
Summary of Contents for BOTTOM PLAYHOUSE
Page 1: ...Owners Instruction Manual...
Page 2: ......
Page 3: ......
Page 4: ......
Page 5: ...Accessories Identification 1 Roll of electrical tape...
Page 6: ...Hardware Identification...
Page 7: ......
Page 8: ...Wood and Kit Identification Bottom Playhouse 1 2 INNER TREEHOUSE WALL KIT PART WK55...
Page 15: ......
Page 16: ......
Page 17: ......
Page 18: ......
Page 19: ...Owners Instruction Manual...
Page 20: ......
Page 21: ......
Page 22: ......
Page 23: ...Accessories Identification 1 Roll of electrical tape...
Page 24: ...Hardware Identification...
Page 25: ......
Page 26: ...Wood and Kit Identification Sky Bottom Playhouse 1 2 INNER TREEHOUSE WALL KIT PART WK55...
Page 34: ......
Page 35: ......
Page 36: ......
Page 37: ......