![background image](http://html1.mh-extra.com/html/eastern-jungle-gym/bottom-playhouse/bottom-playhouse_assembly-instructions-manual_3459355031.webp)
Step #9-Wall Filler Sky Bottom Playhouse
Step #10-Upper Front Wall Install Sky Bottom Playhouse
Install wall filler on both
ends of inner WK55.
Secure in place using B6
bolts.
Repeat steps #6,#8, and #9
Place upper side wall panel on
outside of upper tower post. Raise
until the top of the rail is flush with
the bottom of the floor joist. Install
using (4)-B4 bolts.
Summary of Contents for BOTTOM PLAYHOUSE
Page 1: ...Owners Instruction Manual...
Page 2: ......
Page 3: ......
Page 4: ......
Page 5: ...Accessories Identification 1 Roll of electrical tape...
Page 6: ...Hardware Identification...
Page 7: ......
Page 8: ...Wood and Kit Identification Bottom Playhouse 1 2 INNER TREEHOUSE WALL KIT PART WK55...
Page 15: ......
Page 16: ......
Page 17: ......
Page 18: ......
Page 19: ...Owners Instruction Manual...
Page 20: ......
Page 21: ......
Page 22: ......
Page 23: ...Accessories Identification 1 Roll of electrical tape...
Page 24: ...Hardware Identification...
Page 25: ......
Page 26: ...Wood and Kit Identification Sky Bottom Playhouse 1 2 INNER TREEHOUSE WALL KIT PART WK55...
Page 34: ......
Page 35: ......
Page 36: ......
Page 37: ......