Strip the insulation from the multi-strand anode wire back approximately ¾ inch from the end and while
keeping the strands together, push the anode wire through the
gland nut, gland cage, gland
and
plug body
as shown in Figure 15. Loosen one of the two screw terminals on the
plug insert
to
receive all of the strands of anode wire on one terminal.
Figure 15. Anode Wire Insertion
After inserting all strands of the anode wire into one of the terminals on the
plug insert
, tighten the
wire in place by tightening the screw on that terminal. Once tightened, push the
plug insert
back into
the
plug body
as shown in Figure 16 until it is firmly seated. Engage the
locking ring
with threads in
the
plug body
and turn clockwise with the
sealing cap assembly tool
until the
lock ring
is firmly
seated and tight against the
plug insert.
Summary of Contents for Prime Series
Page 15: ...PSC QS 10 16 Page 15 Figure 8a PSC Compressor Electrical Schematic 230 1 60...
Page 16: ...PSC QS 10 16 Page 16 Figure 8b PSC Compressor Unit Electrical Schematic 230 3 60...
Page 17: ...PSC QS 10 16 Page 17 Figure 9 PSC Air Heating Cooling System Application...
Page 18: ...PSC QS 10 16 Page 18 Figure 10 PSC Air Heating Cooling System Field Wiring Diagram...
Page 26: ...PSC QS 10 16 Page 26 Figure 14 Disassembled Plug Connector...
Page 33: ...PSC QS 10 16 Page 33 Figure 23 PSC Internal Flow Schematic...
Page 34: ...PSC QS 10 16 Page 34 Figure 24 PSC Piping...
Page 36: ...PSC QS 10 16 Page 36 Figure 25 Evacuation of PSC System...
Page 38: ...PSC QS 10 16 Page 38 Figure 26 Initial Charge of PSC System...
Page 40: ...PSC QS 10 16 Page 40 Figure 27 Final Charge of PSC System...
Page 43: ...PSC QS 10 16 Page 43 Figure 31 Start Up Process...
Page 52: ...PSC QS 10 16 Page 52...
Page 53: ...PSC QS 10 16 Page 53...
Page 54: ...PSC QS 10 16 Page 54...
Page 55: ...PSC QS 10 16 Page 55...
Page 56: ...PSC QS 10 16 Page 56...
Page 57: ...PSC QS 10 16 Page 57...