PSC-QS (10/16)
Page 9
Figure 3. Compressor Unit Bracket Installation
Figure 4. Compressor Unit Clearance
Placement instructions for other pieces of equipment that make up the EarthLinked
®
System are
included with those pieces of equipment and are listed in this manual under
Equipment Manuals.
3)
Refrigeration
After the EarthLinked
®
compressor unit and other system components are placed, the refrigeration
system tubing is run from the compressor unit to the other components, as appropriate. Figure 5
illustrates the refrigeration and electrical connection points for the compressor unit.
IMPORTANT!
EarthLinked
®
compressor units that provide space cooling shall be
equipped with an EarthLinked
®
Hybrid Cooling Module (HCM) when:
(1) Required by the performance tables; OR
(2) System is in a Cooling dominant application where soil thermal
conductivity is unknown or known to be poor (less than 1
BTU/hr.ft.°F). Examples of such soils are light dry soil, dry sand, peat
and organic soils, dry clay and hardpan; OR
(3) In any system where soil thermal conductivity is unknown or known
to be poor (see (2) for definition) and ambient outdoor temperatures
have exceeded the outdoor summer design temperature conditions
for a continuous system run time of at least 7 hours.
Summary of Contents for Prime Series
Page 15: ...PSC QS 10 16 Page 15 Figure 8a PSC Compressor Electrical Schematic 230 1 60...
Page 16: ...PSC QS 10 16 Page 16 Figure 8b PSC Compressor Unit Electrical Schematic 230 3 60...
Page 17: ...PSC QS 10 16 Page 17 Figure 9 PSC Air Heating Cooling System Application...
Page 18: ...PSC QS 10 16 Page 18 Figure 10 PSC Air Heating Cooling System Field Wiring Diagram...
Page 26: ...PSC QS 10 16 Page 26 Figure 14 Disassembled Plug Connector...
Page 33: ...PSC QS 10 16 Page 33 Figure 23 PSC Internal Flow Schematic...
Page 34: ...PSC QS 10 16 Page 34 Figure 24 PSC Piping...
Page 36: ...PSC QS 10 16 Page 36 Figure 25 Evacuation of PSC System...
Page 38: ...PSC QS 10 16 Page 38 Figure 26 Initial Charge of PSC System...
Page 40: ...PSC QS 10 16 Page 40 Figure 27 Final Charge of PSC System...
Page 43: ...PSC QS 10 16 Page 43 Figure 31 Start Up Process...
Page 52: ...PSC QS 10 16 Page 52...
Page 53: ...PSC QS 10 16 Page 53...
Page 54: ...PSC QS 10 16 Page 54...
Page 55: ...PSC QS 10 16 Page 55...
Page 56: ...PSC QS 10 16 Page 56...
Page 57: ...PSC QS 10 16 Page 57...