Figure 2a illustrates a typical installation of a GSTE storage water heater with a commercial
water heating compressor unit. Location of the tank from the compressor unit is to be no more
than 10 ft. apart. Water piping and connections between the compressor unit and tank are all
1-1/2” Type L copper. Hot water supply to the system is out the top of the tank as shown.
Details for the ports and connections on top of the tank are shown in Figure 2b. The electrical
field wiring for the HHK-1872 temperature controller and the storage water heater electric
element and thermostat are illustrated in Figure 2c.
Figure 2a. Commercial Water Heating Application
Summary of Contents for GSTE-119
Page 5: ...SWH IOM 08 10 Page 5 Figure 1 GSTE Storage Water Heater Description...
Page 7: ...SWH IOM 08 10 Page 7 Figure 2b Top of Tank Connections CWH...
Page 8: ...SWH IOM 08 10 Page 8 Figure 2c Electrical Field Wiring CWH...
Page 10: ...SWH IOM 08 10 Page 10 Figure 3b Top of Tank Connections DWM...
Page 11: ...SWH IOM 08 10 Page 11 Figure 3c Electrical Field Wiring DWM...
Page 13: ...SWH IOM 08 10 Page 13 Figure 4b Top of Tank Connections Desuperheater...
Page 14: ...SWH IOM 08 10 Page 14 Figure 4c Electrical Field Wiring Desuperheater...
Page 16: ...SWH IOM 08 10 Page 16 Figure 5b Top of Tank Hydronic Heating HWM...
Page 25: ...SWH IOM 08 10 Page 25...