DSH KIT (04/13)
Page 19
CC Compressor Unit
Figure 12. CC Compressor Unit Field Wiring
1. Turn “OFF” all electrical power to the EarthLinked
®
system.
2. Drill holes in electrical box as necessary to install fuse holders and terminal strips as
shown in Figure 12.
3. Connect wires as shown in Figure 12.
4. Field wire DSH to terminal strips.
5. Install fuses.
6. Check all wiring for proper routing and ensure good connections at all terminals, prior to
restoring electric power to the system components.
7. Test system for functionality.
Summary of Contents for DSH-1872
Page 5: ...DSH KIT 04 13 Page 5 Figure 2 Desuperheater installed with GSTE Storage Water Heater...
Page 6: ...DSH KIT 04 13 Page 6 Figure 3a SC Field Wiring for Desuperheater Kit...
Page 7: ...DSH KIT 04 13 Page 7 Figure 3b CC Compressor Unit Field Wiring...
Page 11: ...DSH KIT 04 13 Page 11 Figure 4 SC Cabinet Dimensions and Connections...
Page 12: ...DSH KIT 04 13 Page 12 Figure 5 CC Cabinet Dimensions and Connections...
Page 13: ...DSH KIT 04 13 Page 13 Figure 6 SC Internal Flow Schematic with Desuperheater...
Page 14: ...DSH KIT 04 13 Page 14 Figure 7 SC Piping with Desuperheater...
Page 15: ...DSH KIT 04 13 Page 15 Figure 8 CC Internal Flow Schematic with Desuperheater...
Page 16: ...DSH KIT 04 13 Page 16 Figure 9 CC Piping with Desuperheater...