Earthcore Industries
Isokern Maximus Linear Series See-Thru Gas Fireplace
02/2021
18
Isokern Maximus Linear See-Thru Installation
The following assembly instructions identify the parts by name, part number, and illustrate the placement of each part in
the assembly process for the Maximus Linear See-Thru Fireplace.
NOTE:
At all component joints, be sure to mortar all contact surfaces with Earthcore Adhesive. Check for complete sealing of
each contact joint as the firebox assembly progresses.
1)
Apply Earthcore Adhesive to the joints between each baseplate part and ensure to set each base plate in a full bed of
Earthcore Adhesive on a level support surface
(Figure 8)
. See page 15 for information regarding the supporting floor
system. Do not set the base plate so that it is in span. Refer to pages 6-13 for part and assembled firebox dimensions.
IMPORTANT: ENTIRE BASEPLATE ASSEMBLY SHALL BE FLUSH, LEVEL, AND ALIGNED WITH EACH OTHER.
Baseplate:
48": Part# M93
72": Part# M91 (Qty 2)
96": Part# M92, M93, 191
120": Part# M92, M93, M96
FIGURE 8
IMPORTANT
: The Isokern base plate shall be
fully supported with no portion in span.