13
IMPORTANT
For all valves, the air
MUST
be purged from the gas line before the pilot will light and burn properly. The time
needed to purge will depend on the length of the gas line to the unit and the amount of time since the unit or
gas line was last used. It may take several minutes before all the air is purged and the pilot will light and burn
properly. Reference the LIGHTING INSTRUCTIONS section in this manual.
INSTALLATION (cont.)
8.
Place the decorative heat shield over the switch box as
shown in Fig. 13-1.
LIGHTING TEST
Prior to proceeding with installation, perform a lighting test
(see lighting instructions for lighting your burner).
Allow the
unit to completely cool after testing.
LAVA GRANULES/COALS (DECORATIVE)
1.
Spread the supplied lava granules on the fl oor of the
fi replace, around the front and sides of the burner system
(see Fig. 13-2). The lava granules may be placed around
the switch box. Leave the front of the switch box clear for
control access.
2.
Repeat this process for the supplied lava coals (on top of
the already placed lava granules).
Note:
DO NOT place any lava media on the burner system,
or behind it.
WOOD CHUNKS (DECORATIVE)
1.
Spread the supplied wood chunks on the lava media,
around the front and sides of the burner system. Leave
the front of the switch box clear for control access.
Note:
DO NOT place any wood chunks on the burner system,
or behind it.
LOG LOCATORS (if applicable)
36/39 models include a set of log locators. They are used to
support the front logs of select log sets. If the log set chosen
includes log locator install details (in placement instructions),
install accordingly. If not, discard the log supports.
Fig. 13-2
Place lava media
Fig. 13-1
Place heat shield
Must rest on fl oor and at rear corner