
INSTALLATION
PAGE 10
11. If the floor of the fireplace is lower than the hearth,
a leveling bolt will need to be installed (not included
with the hardware. Use a 3/8” (10 mm) bolt with 2
nuts). The bolt length should be at least 1” (25.4
mm) longer than needed. Locate the leveling bolt
bracket on the lower back of insert. Install the level-
ing bolt with nuts and adjust length as needed.
Example: If rise needed is 2” / 51 mm, use a 3” / 75 mm
or larger bolt.
Side View
Leveling Bolt
12. Reaching over the top of the insert, install the
starter pipe in the stove flue, or attach the positive
flue connection to the insert. See * Note.
SURROUND ASSEMBLY (PURCHASED SEPARATELY)
NOTE: Do not face seal over chimney cooling air
system on superior brand or any brand fireplace
which is designed with the chimney cooling air sys-
tem.
13. Pull the insert slightly forward to its desired position;
attach the face shield using the surround clips and
hardware as shown. The fiberglass insulation strips
should be secured along the top and sides (step 3).
Assemble the gold-tone trim using the 2 inside cor-
ner brackets. Attach trim to the face shield and
stove.
Heat Deflector Must Be
Installed If There is a Mantel
Bracket on Insert
3/8” Nuts
3/8” Bolt
Rise
Bolt
Length
Slide Far
Enough In To
Attach Pipe
Mantel
Heat
Deflector
f i r e - p a r t s . c o m