Eagle Eye Power Solutions, LLC. 

 

LB-60-30 Schematic 

 

RP1

 

 

 

R3 

SR1 

R6

 

Ln1 

Ln2

 

Ln3 

N

 

K7 

 

R4

 

L4 

D1 

D5

 

 

 
 

 

CT1

 

FS3 

FS4 

FS5 

M2

 

L1 

L2 

L3

 

 
 

D4 

D3 

D2

 

K7

 

 

TP4 

TP1 

TP2 

TP3

 

 

 

LR22

 

K1 

LR23

 

LR24

 

1KW

 

 
 

 

F1 

F2 

F3 

 

F4 

F5 

F6 

C1

 

LR1

 

K2 

LR2

 

LR3

 

2KW

 

 
 

LR4

 

K3 

LR5

 

LR6

 

 
 

2KW

 

 

RT1

 

 
 
 

 

R1 

R2 

R5

 

 

5KW

 

LR7 

  

 

K4 

LR8

 

LR9

 

 

M1 

M3

 

 

SW2

 

 

FS1

 

 
 

 

SW1

 

 
 

FS2

 

LR10

 

 

   10KW 

 

SW11

 

SW10

 

SW9

 

K5 

  

 

 
 
 

 

  

 

LR13 

 

 

LR11

 

LR14

 

LR12 

LR15

 

2

 

 
 

 

K1

 

SW3 1KW

 

 
 
 

 

LEGEND

 

 

 

C1 

CAPICATOR  350UF, 160DC

 

C3 

CAPICATOR 100V 15UF

 

LR16

 

  10KW 

 

CT1 

CURRENT TRANSFORMER 100:5

 

LR18 

  

 

 

 

K6

 

  

 

 

LR19 

 

 

LR17

 

LR20

 

 

LR18 

 

 

LR21

 

K2 

  

 

 

SW4 2KW

 

 

K3

 

SW5 2KW

 

 

K4

 

 

SW6 5KW

 

 

K5 

  

 

 

SW7 10KW

 

 

 

K6

 

D1-4 

DIODE 1A

 

D5 

ZENER DIODE 120V 5W

 

FN1-6 

FAN  24VDC

 

FS1 

FUSE, 5A

 

FS2 

FUSE, 1A

 

FS3-5 

FUSE, 125A

 

K1-6 

RELAY, 120VAC 3PST 30A

 

K7 

RELAY, 24VDC 2PDT 3A

 

L1-3 

LIGHT, NEON 115V

 

LT4 

LIGHT, NEON 115V-RED

 

LR1-6 

LOAD RESISTOR 18.8

 

LR7-21 

LOAD RESISTOR 8.0

 

LR22-24 

LOAD RESISTOR 40.0 OHM 

M1 

METER,50-65  HERTZ

 

M2 

METER, 0-100AMP

 

M3 

METER, 0-150 VOLT

 

R1-2,5 

RESISTOR 25W, 5

 

R3 

RESISTOR 560 OHM 5 WATT

 

 
 
 
 
 

FIGURE 5-3

 

SW8 10KW

 

R4 

RESISTOR  7.5K 5 WATT

 

R6 

RESISTOR 5.6K OHM 5 WATT

 

RP1 

RECEPTACLE, 4 POLE

 

RT1 

RECTIFIER 6A

 

SR1 

SCR 12AMPS

 

SW1 

SWITCH, TOGGLE DPST

 

SW2 

SWITCH, ROTARY 3POS 1 POLE 

SW3-8 

SWITCH, TOGGLE SPST

 

SW9 

SWITCH, AIR FLOW

 

SW10 

THERMAL SWITCH 155°

 

SW11 

MERCURY  SWITCH

 

TP1-4 

TEST PINS

 

Summary of Contents for LB-60-30

Page 1: ...gle Eye Power Solutions LLC LB 60 30 LOAD BANK MANUAL CONTAINS OPERATING INSTRUCTIONS PARTS LIST WIRING DIAGRAMS SERVICE INSTRUCTIONS Eagle Eye Power Solutions LLC 4031 W Kiehnau Ave Milwaukee WI 5320...

Page 2: ...THE POTENTIAL OF DELIVERING A LETHAL SHOCK THIS LOAD BANK SHOULD BE USED ONLY BY TRAINED AND QUALIFIED PERSONNEL THIS LOAD BANK IS DESIGNED FOR TEMPORARY USE ONLY THE LOAD RESISTORS ARE ENERGIZED WHEN...

Page 3: ...GLE PHASE 2 1 TESTING 240VAC SINGLE PHASE 2 3 TESTING 208VAC THREE PHASE 2 5 PARTS PARTS INFORMATION 3 1 CONTROL PANEL PARTS LAYOUT FIGURE 3 1 3 2 CONTROL PANEL PARTS LIST 3 3 INTERIOR PARTS LAYOUT FI...

Page 4: ...LOAD BANK The LB 60 30 is rated at 30 KW full loads with all six load steps turned on The load steps are 1KW 2KW 2KW 5KW 10KW and10KW This gives a 0 30KW range in 1KW steps All steps are continuous 1...

Page 5: ...C VOLTS AC AMPS FREQUENCY METER METER SWITCH 60 58 55 HERTZ A B C 62 65 L1 L2 L3 B A C ON MAIN POWER INDICATOR LIGHTS OFF METER RATE SWITCHES METER TEST JACKS 1KW 2KW 2KW 5KW 10KW 10KW OFF A B C N FIG...

Page 6: ...equency of the power unit It should read approximately 60HZ METER SWITCH Switch used to select A B or C phase on the voltmeter RATE SWITCHES Switch used to select the desired rate on the load bank The...

Page 7: ...of the power unit 2 3 CHECKING THE POWER check the following A The amber light A should beon B The voltmeter should read 120VAC on A phase C The frequency meter should read approximately60HZ D The amm...

Page 8: ...t of the power unit 2 3 CHECKING THE POWER check the following A The amber light A and B should beon B The voltmeter should read 120VAC on A and B phase C The frequency meter should read approximately...

Page 9: ...2 3 CHECKING THE POWER check the following A The amber light A B C should beon B The voltmeter should read 120VAC on A B and C phase C The frequency meter should read approximately60HZ D The ammeter...

Page 10: ...LC PARTS INFORMATION CONTROL PANEL PARTS 1 11 2 60 90 30 0 120 150 40 60 20 0 80 100 AC VOLTS AC AMPS 4 55 3 60 58 HERTZ A B C 62 65 L1 L2 L3 B 10 A C 5 6 7 METER MAIN ON 9 OFF 1KW 2KW 2KW 5KW 10KW 10...

Page 11: ...BER USED 1 MR 61 0 150V VOLT METER 1 2 MR 64 0 100 A AMMETER 1 3 MR 60 55 65 HERTZ FREQUENCY METER 1 4 HD 25 HANDLE 2 5 KN 10 POINTER KNOB 1 6 SW 13 ROTARY SWITCH 3POSITION 1 POLE 1 7 SW 21 TOGGLE SWI...

Page 12: ...INTERIOR PARTS LAYOUT 4 3 15 1 2 5 8 23 21 23 22 24 25 19 6 16 17 18 20 9 10 7 7 11 12 13 14 FIGURE 3 2...

Page 13: ...5 RELAY 120VAC 30A 6 8 RC 25 560 RESISTOR 5W 1 9 RC 56 5 6K RESISTOR 5W 1 10 RY 20 RELAY 2PDT 24VDC 3A 1 11 SW 11 AIR FLOW SWITCH 1 12 RS 20 RELAY SOCKET 2P 1 13 LR 08 8 0 RESISTOR 15 14 LR 40 40 RESI...

Page 14: ...Eagle Eye Power Solutions LLC FAN PANEL PARTS LAYOUT 10 1 2 3 4 5 6 7 8 9 FIGURE 3 3...

Page 15: ...STOR 25W 3 2 TM 20 8 POSITION TERMINAL STRIP V BEAU PRODUCTS 78008 1 3 TM 10 TERMINAL STRIP 11 POS 1 4 RD 06 RECTIFIER 6A 1 5 CP 35 CAPICATOR 350UF 160VDC 1 6 FP 28 ALUM FAN PANEL 1 7 GL 10 FAN GRILL...

Page 16: ...be kept free of any trash Do not place any objects in the fan or resistor grill FAN REPLACEMENT The following are steps to take to replace a defective fan 1 Remove the screws holding the fan panel to...

Page 17: ...1 WIRES TO LOAD BANK FAN PANEL WIRING FIGURE 5 2 1 RED 6 BLK 4 G R ED F1 F1 F2 F2 F3 8 G B LU F3 3 4 G RE D F4 F4 F5 9 WHT 10 WHT F5 F6 7 8 G BL U F6 F1 F2 F3 C1 9 WH ITE SW11 12 WHITE 7 11 RED R5 1R...

Page 18: ...Eagle Eye Power Solutions LLC INTERIOR WIRING...

Page 19: ...K3 SW5 2KW K4 SW6 5KW K5 SW7 10KW K6 D1 4 DIODE 1A D5 ZENER DIODE 120V5W FN1 6 FAN 24VDC FS1 FUSE 5A FS2 FUSE 1A FS3 5 FUSE 125A K1 6 RELAY 120VAC 3PST 30A K7 RELAY 24VDC 2PDT3A L1 3 LIGHT NEON 115V...

Page 20: ...gle Eye Power Solutions LLC Contact EEPS Eagle Eye Power Solutions LLC 4031 W Kiehnau Ave Milwaukee WI 53209 TEL 1 877 805 EEPS 3377 FAX 1 414 962 3660 www eepowersolutions com info eepowersolutions c...

Reviews: