EAGLE MTP-11V3 Product Manual
22
(Fig. 13b)
5] All adjustments should be made at the exposed cable end pointing upward at the front of each
carriage. It may be necessary to secure the cable end with a pair of vice grips inside the carriage.
6] Remove the slack from both cables. Before all slack is removed, begin to alternate from one
post to the other. First tighten one cable a few turns, before returning to the other post and
tightening the second cable an equal number of turns. If done correctly, both cables will tighten
up an equal amount, and neither carriage will lift off the locks as they are tightening against one
another.
7] Continue to tighten the cables until there is ½” of deflection in the cable about 3 feet above the
carriage at the back of each column (Fig 13a).
8] Install a second nut on each of the cable ends and lock them tightly against the first nut.
Summary of Contents for MTP-11V3
Page 20: ...EAGLE MTP 11V3 Product Manual 20 Fig 11e Fig 11f...
Page 32: ...EAGLE MTP 11V3 Product Manual 32 Fig 22...
Page 39: ...EAGLE MTP 11V3 Product Manual 39...
Page 40: ...EAGLE MTP 11V3 Product Manual 40 SUPPLEMENTAL...
Page 41: ...EAGLE MTP 11V3 Product Manual 41...