EAGLE MTP-11V3 Product Manual
17
6] All anchors must have a minimum of 3 ¼” embedment in the concrete. If the top of the anchor
exceeds 2 ¼” above the floor grade, you
DO NOT
have enough depth on the anchors.
STEP 7
Installing the Overhead Beam
1] Connect the two overhead beam sections together and install (5) ½” bolts, flat washers, lock
washers, and nuts.
Note: The bolts should be inserted from the inside facing out.
2] Attach the ends of the Overhead Beam to the post top caps using (4) ½” bolts, flat washers,
lock washers, and nuts. (Fig. 10)
(Fig. 10)
STEP 8
Securing the Off Side Post
1] Re-check the position and placement of the Off Side Post. Make sure the post is plumb and
square in relation to the Main Side Post.
2] Drill through the holes in the base plate and install anchor bolts and secure the Off Side Post
as described in
Step 5, numbers 1-6 above.
3] Both posts are now secured.
Summary of Contents for MTP-11V3
Page 20: ...EAGLE MTP 11V3 Product Manual 20 Fig 11e Fig 11f...
Page 32: ...EAGLE MTP 11V3 Product Manual 32 Fig 22...
Page 39: ...EAGLE MTP 11V3 Product Manual 39...
Page 40: ...EAGLE MTP 11V3 Product Manual 40 SUPPLEMENTAL...
Page 41: ...EAGLE MTP 11V3 Product Manual 41...