Installation, Operation and Parts Manual
EE-6604 V2.BWF
-
8
PACKING,
STORAGE
AND
TRANSPORTATION
Packing,
lifting,
handling,
transporting
operations
must
be
performed
only
by
experienced
personnel
with
appropriate
knowledge
of
the
lift
and
after
reading
this
manual.
2.1
The
lift
was
dismantled
into
3
parts
for
transportation
Name
Packed
by
Dimension
Weight
Quantity
Control
cabinet
Wooden
case
510*480*1300
84KG
1
Power
side
platform
Carton
with
wooden
base
5100*700*360
1550KG
1
The
secondary
platform
Carton
with
wooden
base
5100*700*360
1550KG
1
Ramp
Bubble
film
1300*680*250
106KG
1
2.2
Storage
The
packs
must
be
kept
in
a
covered
and
protected
area
in
a
temperature
range
0f
‐
10
℃
to
+40
℃
.
They
must
not
be
exposed
to
direct
sunlight,
rain
or
water.
Stacking
the
packs
We
advise
against
stacking
because
the
packs
are
not
designed
for
this
type
of
storage.
The
narrow
base,
heavy
weight
and
large
size
of
the
packs
make
stacking
difficult
and
potentially
dangerous.
If
stacking
is
unavoidable,
use
all
appropriate
precautions:
‐
never
stack
to
more
than
2
meters
in
height.
‐
never
make
stacks
of
single
packs.
Always
stack
pairs
of
packs
in
a
cross
pattern
so
that
the
base
is
bigger
and
the
resulting
stack
is
more
stable.
Once
the
stack
is
complete,
restrain
it
using
straps,
ropes
or
other
suitable
methods.
A
maximum
of
two
packs
can
be
stacked
on
lorries,
in
containers,
and
in
railway
wagons,
on
condition
that
the
packs
are
strapped
together
and
restrained
to
stop
them
falling.
2.3
Lifting
and
handling
The
packs
can
be
lifted
and
transported
only
by
using
lift
trucks.
The
center
of
gravity
and
lashing
points
are
marked
on
the
packaging.
Never
attempt
to
hoist
or
transport
the
unit
using
lifting
slings.
Opening
the
packs
When
the
lift
is
delivered
make
sure
that
it
has
not
been
damaged
during
transportation
and
that
all
the
parts
specified
on
the
packing
list
are
present.
Packs
must
be
opened
adopting
all
the
precautions
required
to
avoid
injury
to
persons
(keep
at
a
safe
distance
when
cutting
the
straps)
or
damage
to
parts
of
the
machine
(be
careful
that
no
parts
are
dropped
while
you
are
opening
the
packing)
Take
special
care
with
the
hydraulic
power
unit,
the
control
panel
and
the
platform
cylinder.
Summary of Contents for EE-6604V2 .BWF
Page 10: ...Installation Operation and Parts Manual EE 6604 V2 BWF 10 3 3 Dimensions...
Page 23: ...Installation Operation and Parts Manual EE 6604 V2 BWF 23 2 Recessed Mounting...
Page 25: ...Installation Operation and Parts Manual EE 6604 V2 BWF 25...
Page 26: ...Installation Operation and Parts Manual EE 6604 V2 BWF 26...