Installation, Operation and Parts Manual
EE-6604 V2.BWF
-
15
2)
Push
the
UP
button
to
raise
the
platforms
to
the
max
height
and
then
lower
to
the
minimum
height.
Repeat
this
for
3
cycles.
Pay
attendion
to
push
the
UP
button
very
slightly
and
slowly
when
the
platforms
almost
reach
to
the
max
height.
After
that,engage
the
mechanical
safety
locks
and
push
DOWN
I
and
DOWN
II
to
completely
lower
the
platforms.
This
step
may
needs
pretty
long
time
as
there
remained
air
in
the
oil
cylinders
and
no
load
on
the
plafroms
.
3)
Repeat
the
cycles
of
step
2
for
two
or
three
times.
Turn
off
the
two
levelling
valves
when
platforms
are
fully
lowered.
Turn
the
two
handles
to
the
following
status.
4)
Turn
SA1
to
normal
working
status
and
push
UP
button
to
check
the
synchronization.
(Normally,
the
two
platforms
are
not
synchronized
till
this
step
).
5)
If
not
being
synchronized
and
one
platform
rises
faster
than
the
other,
open
the
levelling
valve
that
controls
the
slower
platform
and
turn
SA1
to
levelling
status,
push
the
UP
button
slightly
until
both
platforms
are
at
the
same
height.
Close
the
levelling
valve.
6)
Turn
SA1
to
normal
working
status
and
check
the
synchronization.
7)
IF
still
not
being
synchronized,
repeat
step
4
to
step
6
until
both
platforms
are
synchronized.
Levelling
the
secondary
lift
1)
Turn
SA2
on
control
panel
to
JACK
and
turn
SA1
to
leveling
status.
2)
Push
UP
button
until
both
platform
of
the
jack
go
utmost
top
to
bleed
air
in
the
cylinders.
3)
Push
DOWN
I,
until
jacks
lower
to
the
lowest
position.
PUSH
UP
BUTTON
TO
CHECK.
THE
JACKS
SHOULD
BE
SYNCHRONIZED
BY
THIS
STEP.
Repeat
the
above
levelling
steps
until
synchronization
reached.
Summary of Contents for EE-6604V2 .BWF
Page 10: ...Installation Operation and Parts Manual EE 6604 V2 BWF 10 3 3 Dimensions...
Page 23: ...Installation Operation and Parts Manual EE 6604 V2 BWF 23 2 Recessed Mounting...
Page 25: ...Installation Operation and Parts Manual EE 6604 V2 BWF 25...
Page 26: ...Installation Operation and Parts Manual EE 6604 V2 BWF 26...