![background image](http://html1.mh-extra.com/html/eae/ee-6445p/ee-6445p_installation-operation-and-parts-manual_3272757012.webp)
Installation, Operation and Parts Manual
EE-6445P
12
4.3
General
installation
instructions
Step
1:
Fix
the
installation
layout.
Mark
the
four
standing
points
of
the
four
posts
on
the
installation
site
by
a
tape
measure
and
chalk.
Ensure
two
diagonal
lines
are
of
the
same
length.
Step
2:
Remove
the
packing
materials.
Attention:
Packs
must
be
opened
adopting
all
the
precautions
required
to
avoid
injury
to
persons
(keep
at
a
safe
distance
when
cutting
the
straps)
or
damage
to
parts
of
the
machine
(be
careful
that
no
parts
are
dropped
while
you
are
opening
the
packing)
Take
special
care
with
the
hydraulic
power
unit,
the
power
unit
and
the
platform
cylinder.
Avoid
scratching
the
painting
surface
and
hoses.
1.
Place
some
wooden
battens
(thickness
of
which
should
be
more
than
80mm)
on
the
ground
(other
dependable
devices
may
also
applicable)
and
then
use
forklift
to
have
the
packing
rack
removed
on
to
the
battens.
2.
Have
the
platforms
of
the
lift
suspended
by
the
forklift
and
then
screw
off
the
upside
bolt
and
remove
the
first
platform
on
to
the
wooden
battens
initially
prepared.
3.
Screw
off
the
downside
bolt
and
take
away
the
packing
racks
on
both
sides.
4.
Remove
the
shock
absorption
plastic
film
with
a
knife.
Step
3:
Use
the
forklift
to
have
the
general
parts
properly
positioned.
For
convenient
installation,
it
would
be
better
to
pad
something
supporting
under
the
platform.
Oil
cylinder,
steel
cable
and
oil
hose
have
already
been
fixed
in
the
power
side
platform
(platform
with
oil
cylinder
beneath)
before
packing.