background image

 

 

E2S Warning Signals

      Impress House, Mansell Road, Acton, London W3 7QH

 

www.e2s.com

 

Tel: +44 (0)208 743 8880

 

Document No. D199-00-001-IS

 

Issue 7

 

13-05-22

 

 

Sheet 5 of 8

 

 

When connecting wires to the terminals great care should be 
taken to dress the wires so that when the cover is inserted into 
the  chamber  the  wires  do  not  exert  excess  pressure  on  the 
terminal  blocks.  This  is  particularly  important  when  using 
cables with large cross-sectional areas such as 2.5mm². 
 

Earthing 

 
Both AC and DC sounder units must be connected to an earth 
according  to  EN/IEC  60079/14.  The  units  are  provided  with 
internal and external earth terminals which are both located on 
the terminal chamber section of the unit (see figure 5). 

 

External earthing connections should be made to the M5 earth 
stud, using a ring crimp terminal to secure the earth conductor 
to  the  earth  stud  between  the  two  M5  stainless  steel  flat 
washers, then reassemble the M5 spring washer and tighten 
the  M5  nut  to  ensure  that  the  cable  lug  is  secured  against 
loosening and twisting. The external earth conductor should be 
at least 4mm

2

 in size. 

 

ATEX / IECEx & UKEx Requirements Only 
 
Internal  earthing  connections  should  be  made  to  the 
Internal Earth terminal in the base of the housing using 
a ring crimp terminal to secure the earth conductor under 
the earth clamp. The earth conductor should be at least 
equal  in  size  and  rating  to  the  incoming  power 
conductors. 
 
NEC / CEC Requirements Only 
 
Internal  earthing  connections  should  be  made  to  the 
Internal Earth terminal in the base of the housing using 
a ring crimp terminal to secure the earth conductor under 
the earth clamp. The earth conductor should be at least 
equal  in  size  and  rating  to  the  incoming  power 
conductors but at least a minimum of 0.82mm2 / 18AWG 
in size. 

 

7.3. Cable Glands, Blanking Elements & Adapters 

 
Follow the minimum temperature ratings of cables and cable 
glands according to the approvals applied. 
 

ATEX / IECEx & UKEx Requirements Only

 

 
For  high  ambient  temperatures  the  cable  entry 
temperature  may  exceed  70ºC  or  the  cable  branching 
point  temperature  may  exceed  80ºC  and  therefore 
suitable heat resisting cables and cable glands must be 
used, with a rated service temperature at least as stated 
below: 
 

 

Table 2: ATEX / IECEx & UKEx Min. Ratings of Cables & 

Cable Glands. 

 
 
 
 
 
 
 
 

NEC / CEC Requirements Only 
 
For  high  ambient  temperatures  the  cable  entry 
temperature  may  exceed  60ºC  or  the  cable  branching 
point  temperature  may  exceed  60ºC  and  therefore 
suitable heat resisting cables and cable glands must be 
used, with a rated service temperature at least as stated 
below: 
 

 

Table 3: NEC / CEC Min. Ratings of Cables & Cable Glands. 

 

Cable Glands & Blanking Plugs 

 
Appropriate cable glands to be customer supplied. 
 

ATEX / IECEx & UKEx Requirements Only

 

 
The cable entries have an M20 x 1.5 

– 6H entry thread. 

Only suitably rated and ATEX / IECEx & UKEx certified 
cable glands must be used. They must be suitable for the 
type of cable being used and also meet the requirements 
of  the  current  installation  standards  EN  60079-14  / 
IEC60079-14. 
 
If the installation is made using conduit, openings must 
have a sealing fitting connected as close as practical to 
the wall of the enclosure, but in no case more than the 
size of the conduit or 50mm, whichever is the lesser. 
 
Any  unused  cable  entries  must  be  closed  with  suitably 
rated and ATEX / IECEx & UKEx certified blanking plugs. 

 

NEC / CEC Requirements Only 
 
The cable entries have an M20 x 1.5 

– 6H entry thread. 

Only  suitably  rated  and  certified  cable  glands  must  be 
used. They must be suitable for the type of cable being 
used  and  also  meet  the  requirements  of  the  current 
installation standards for NEC / CEC. 

 

For  use  in  Class  I  Division  II  locations,  in  order  to 
maintain the db type protection, flameproof conduit seals 
and/or cable glands must be used. 
 
Any  unused  cable  entries  must  be  closed  with  suitably 
rated and certified blanking plugs. 

 

Ingress Protection 

 
If  a  high  IP  (Ingress  Protection)  rating  is  required,  then  a 
suitable sealing washer must be fitted under the cable glands 
or blanking plugs. A minimum ingress protection rating of IP6X 
must  be  maintained  for  installations  in  explosive  dust 
atmospheres. 
 
For combustible dust applications, the cable entry device and 
blanking elements shall be in type of explosion protection and 
shall have an IP 6X rating. 
 
 
 
 
 
 
 

Summary of Contents for STExS1

Page 1: ...A 48Vdc 115mA STExS1RAC230 115Vac 73mA 100 240Vac 50 60Hz 80mA 110 105 230Vac 48mA STExS1FDC024 12Vdc 221mA 11 5 54Vdc 221mA 115 110 24Vdc 185mA 48Vdc 115mA STExS1FAC230 115Vac 73mA 100 240Vac 50 60Hz...

Page 2: ...Marking and Notified Body No 2813 UKCA Marking and Notified Body No 0518 3 2 NEC CEC Ratings Gas Class I All models are approved for use as Alarm Horns also comply with the following standards for sig...

Page 3: ...N60529 5 Special Conditions for Safe Use Repair of the flameproof threaded joints and cemented joints is not permitted Figure 1 Flame Path The plastic horn is not anti static and the metallic enclosur...

Page 4: ...xplosive dust atmospheres The installation of the units must also be in accordance with any local codes that may apply and should only be carried out by a competent electrical engineer who has the nec...

Page 5: ...ranching point temperature may exceed 80 C and therefore suitable heat resisting cables and cable glands must be used with a rated service temperature at least as stated below Table 2 ATEX IECEx UKEx...

Page 6: ...n for AC Units Figure 7 AC PCBA SPL Configuration 8 2 Stage Switching Polarity DC Units Switching from positive switching default to negative switching DC Only NOTE Max supply is 33V DC if higher DC v...

Page 7: ...V See documents D190 06 005 for AC schematic diagrams 1a AC Single Stage Configuration 1 1b AC Three Four Stage Configuration 1 2 AC Two Three Stage Voltage Free Activation Configuration K Table 4 Sum...

Page 8: ...rrent relevant standards ATEX IECEx UKEx Requirements Only EN60079 19 IEC60079 19 Explosive atmospheres Equipment repair overhaul and reclamation EN 60079 17 IEC60079 17 Explosive atmospheres Electric...

Reviews: