![background image](http://html1.mh-extra.com/html/e-tech/9/9_installation-operating-and-maintenance-instructions_3153348011.webp)
- 10 -
MOUNTING
Min.
25 mm
Min.
400 mm
Min.
200 mm
763 mm
763 mm
442 mm
332 mm
178 mm
379 mm
90 mm
101,6 mm
101,6 mm
48,4 mm
53,2 mm
53,2 mm
48,4 mm
• The boiler must be fixed to a non flammable wall.
• Observing the clearances shown below, drill 2 off
14mm x 100mm holes.
• Fit the 2 bolts supplied and hang the wall bracket.
• Fit washers and nuts
• Hang the boiler
FROST PROTECTION
The boiler is
NOT
fitted with frost protection. If the
boiler is being installed in a position where freezing
could take place, then a suitable external frost
thermostat should be fitted.
CONNECTING TO THE SYSTEM
The boiler is designed to operate on a sealed system
(ie. no open vent or feed and expansion cistern). Hot
water expansion within the system is taken up by the
internal 10 litre expansion vessel.This is suitable for
systems up to 160 litres capacity. If the system
capacity is more than this then an additional expansion
vessel may be required.This can be fitted external to
the boiler at a convenient place on the pipework.
Please note that the circulation pump is fitted to the
flow connection.
INSTALLATION ROOM
The appliance must be positioned in such a way as to be easily accessible
at all times. In addition, the following minimum distances around the
appliance must be complied with
WALL MOUNTING
DIMENSIONS