12
Mounting The Boiler
Having determined the boiler location,
• The points of lock screws of wall bracket and assembly bracket are marked by using the assembly
template inside installation and user’s operating instructions of the device (pages 40-41). The
mounting bracket is an optional part.
• After drilling the marked points, wall assembly bracket and assembly bracket are fixed on the wall
by the dowel and lock screws which are inside the packaging of the device.
• Finally, the boiler is hanged on the wall by placing the assembly bracket on the back side of the
boiler on the mounting bracket assembled on the wall.
Figure 6a
Figure 6b
750 mm
Summary of Contents for SCOT SC 24 HM
Page 43: ...3 4 3 4 3 4 1 2 1 2 65 mm 195 mm 65 mm 65 mm 65 mm OPTIONAL ...
Page 44: ...42 ...