8
The pieces required for the assembly of the device (wall bracket, 5 gaskets for water and gas
connections, screws) are placed on the top styrofoam. The other parts which seen in the fig 2b are
optional. Optional parts are.
• Mounting bracket
• CH connecting pipes (3/4’’, 2 units)
• DHW connecting pipes (1/2’’, 2 units)
• Gas supply pipe (3/4’’, 1 unit)
• Nipples (1/2’’, 2 units- 3/4’’, 3 units)
• 4 units ½” and 6 units ¾” gaskets (for water and gas connections)
Figure 3
BOILER PACKAGING
CAUTION: The instructions on the boiler package should be considered
during transportation and storage of the device.
- The device is delivered with a cardboard box with a dimension of 870 x 520 x 420 (HxWxL) mm as
supported by upper and lower styrofoams (Figure 2a).
Optional
Summary of Contents for SCOT SC 24 HM
Page 43: ...3 4 3 4 3 4 1 2 1 2 65 mm 195 mm 65 mm 65 mm 65 mm OPTIONAL ...
Page 44: ...42 ...