8- INSTALLATION
8.1- Selection of Installation Location of Device
The boiler must be installed in accordance with gas safety regulations and relevant standards. Additionally, the
clearance around the boiler should be as shown in fig 4. In order to make service, maintenance and usage
easier.
Figure
9
: It shows the minimum distances required from the top and sides of the device (Dimensions given
in mm).
The installation must comply with the following minimum distances so that servicing and maintenance of the
boiler can be performed correctly. The position of the boiler must be checked against technical requirements.
Figure 9
-Do not install your boilers in locations that will be exposed to direct sunlight.
Sunlight can cause color change on the exterior of your device over time.
-Ambient temperature of device's installation location should be between 5
-35
0
C.
-The device can be used at altitudes up to 2000 m above sea level.
-There is no need to remove side panels in the combi boiler service
operations.
Minimum 50 mm clearances are given taking into consideration
the share of possible side panel sheet changes.
- Since the outside temperature of the device does not rise above 85 ° C at the maximum heating power,
no special protective measures are required against the combustible construction materials and
components.
15
Summary of Contents for Proteus Premix PPR 14 HCH
Page 9: ...5 4 Technical Specifications 9 ...
Page 10: ...10 ...
Page 28: ...28 ...
Page 29: ...Table 4 29 ...
Page 32: ...16 INSTALLATION TEMPLATE 16 1 HM Model 32 ...
Page 33: ...E E L C 160 mm 00 160 mm cJiD E E o o L C E 16 2 HCH Model 33 ...
Page 34: ...E E L C 160 mm 00 C 160 mm E E o o L C E 16 2 HST Model 34 ...
Page 36: ...36 ...
Page 37: ...37 ...
Page 38: ...38 ...
Page 39: ...39 ...
Page 41: ...41 ...