Tower ESS Unit User Manual
1
Statement of Law
Copyright of this document belongs to Daqin New Energy Tech (Taizhou) Co., Ltd.
No part of this documentation maybe excerpted, reproduced, translated,
annotated or duplicated in any form or by any means without the prior
written authorization of Daqin New Energy Tech (Taizhou) Co., Ltd. All Rights Reserved.
This product complies with the design requirements of environmental protection and personal
safety. The storage, use and disposal of the products shall be carried out in accordance with the
product manual, relevant contract or relevant laws and regulations.
Customer can check the related information on the website of Jiangsu Daqin New Energy Tech
(Taizhou) Co., Ltd. when the product or technology is updated.
Web URL
:
http://www.dyness
-tech.com.cn/
Please note that the product can be modified without prior notification.
Revision History
Revision NO.
Revision Date
Revision Reason
1.0
2019.09.
11
First Published
2.0
2020.03.03
Structural design changed
3.0
2020.06.28
Parameter changes
3.1
2020.09.28
1.Change the connector of the power cable
2.Change the color of Power wake button
3. Add a negative output point and a module
positive point on composite plug of
module,add a negative output point and a
module negative point on composite socket of
module.
4.Add a positive output point and a negative
output point on the composite socket of BDU.
5.Update battery nameplate and module label
3.2
2021.3.2
1
、
Update the System Performance Parameter
2
、
Update Installation clearance requirements
3
、
Update Installation location precautions
4
、
Update the Grounding.
修
订
历
史
产
品
版
本