PowerDepot H5B series User Manual
17
Overcurrent and disconnection protection device must be installed between the battery and
the inverter that isolates both positive and negative conductors.
②When the system used in parallel:
When the system is used in parallel, it supports up to 3 PowerDepot H5B in parallel.
According to the number of parallel system (Take three PowerDepot H5B in parallel as an
example), the system needs to use: Power cable × 3pair, Battery-Inverter communication
cable × 1PCS, Battery-Battery communication cable × 2PCS, Distribution box × 1PCS. The
over-current capacity of the distribution box should be much higher than the maximum
nominal current value when the load is running.
PINOUT of system parallel communication cable:
PINOUT of Battery-Battery communication cable diagram shown as below:
PowerDepot
H5B