background image

 

 
 
 
 
 

 

 

 
 

 

 
 
 
 
 
 

 

 

 
 
 

 
 
 
 
 
 
 
 

POWERBOX F 

User Manual 
 

Summary of Contents for Powebox F Series

Page 1: ...POWERBOX F User Manual ...

Page 2: ...ion 10 3 1 Ready for installation 10 3 1 1 Environmental requirements 10 3 1 2 Tools and data 11 3 1 3 Technical preparation 11 3 1 4 Open the box to have inspection 12 3 1 5 Engineering coordination 13 3 2 Equipment installation 13 3 2 1 Floor installation 14 3 2 2 Mounted on the wall 15 3 2 3 Electrical installation 17 4 Use maintenance and troubleshooting 21 4 1 Battery system usage and operati...

Page 3: ... design requirements of environmental protection and personal safety The storage use and disposal of the products shall be carried out in accordance with the product manual relevant contract or relevant laws and regulations Customer can check the related information on the website of Jiangsu Daqin New Energy Technology Co Ltd when the product or technology is updated Please note that the product c...

Page 4: ... breakdown due to improper operation will not be covered under warranty Caution We have strict inspection to ensure the quality when products are shipped out however please contact us if case bulging or other abnormal phenomenon For your safety device shall be ground connected properly before normal use To assure the proper use please make sure parameters among the relevant device are compatible P...

Page 5: ...qualified trained professionals are allowed to install operate maintain the device Please comply with local safety regulations and operational rules when installation operation and maintenance or it could lead to human injury or device damage Mentioned attentions are only as a supplement to local safety regulations The seller does not undertake any responsibility for device operations or usage vio...

Page 6: ...below Comply with European ROHS Certified SGS employ non toxic non pollution environment friendly battery Anode materials are lithium iron phosphate LiFePO4 safer with longer life span Carries battery management system with better performance possesses protection function like over discharge over charge over current abnormal temperature Self management on charging and discharging Single core balan...

Page 7: ...he dangers Read the user manual before using The scrapped battery cannot be put into the garbage can and must be professionally recycled After the battery life is terminated the battery can continue to be used after it recycled by the professional recycling organization and do not discard it at will This battery product meets European directive requirements This battery product passed the TUV cert...

Page 8: ...10 47 IP65 2 2 Performance Parameter Table 2 2 POWERBOX F performance parameter Item POWERBOXF 2 5 POWERBOX F 5 0 POWERBOX F 7 5 POWERBOX F 10 0 Nominal Voltage V 48 48 48 48 Work Voltage Range V 40 5 54 40 5 54 40 5 54 40 5 54 Nominal Capacity Ah 50 100 150 200 Nominal Energy kWh 2 4 4 8 7 2 9 6 Nominal Power kW 0 7 1 5 2 2 2 9 Max Power kW 2 4 4 8 4 8 4 8 3S Peak Power kW 2 6 5 5 7 2 9 6 3S Peak...

Page 9: ...onnected to the inverter CAN RS485 interface through the network wire Factory default CAN communication mode 3 Negative socket The battery DC output negative pole which is connected to the negative pole of the inverter through the cable 4 LED1 Module 1 status indicator light 5 LED2 Module 2 status indicator light 6 LED3 Module 3 status indicator light 7 LED4 Module 4 status indicator light 8 Groun...

Page 10: ...off off Activated when charging Operation Normal Green led on or blinking slowly Alarm Yellow led on 10 SOC 30 Protection Red led on 2 4 Battery Management System BMS 2 4 1 Voltage Protection Discharging Low Voltage Protection When any battery cell voltage is lower than the protection value during discharging the over discharging protection starts battery stops supplying power to the outside When ...

Page 11: ...ing The protection is over when it recovers to rated return range Less Over temperature protection in discharging When battery s temperature is beyond range of 20 55 during discharging temperature protection starts device stops supplying power to the outside The protection is over when it recovers to rated return range 2 4 4 Other Protection Short Circuit Protection When the battery is activated f...

Page 12: ...ke sure the power system is not charged Battery devices should also be switched off Distribution cable wiring should be reasonable and has the protective measures to avoid touching these cables while operating power equipment when installing the battery system must wear the protective items below The isolation gloves Safety goggles Safety shoes 3 1 1 Environmental requirements Working temperature ...

Page 13: ...voltage of the standby interface meets the requirements of the voltage range of table 2 2 Verify that the maximum discharge current capacity of the user equipment the PV equipment or other power supplies the DC standby interface and the maximum discharge current shall be greater than the maximum charging current of the products used in table 2 2 If the user equipment DC prepared interface maximum ...

Page 14: ...or good condition In the process of unpacking handle with care and protect the surface coating of the object Open the package the installation personnel should read the technical documents verify the list according to the configuration table and packing list ensure objects are complete and intact if the internal packing is damaged should be examined and recorded in detail Packing list is as follow...

Page 15: ...ring capacity Make sure that the battery has enough room to install and that the battery rack and bracket have enough load capacity Wiring Make sure the power line and ground wire are reasonable Not easy to short circuit water and corrosion 3 2 Equipment installation The wall for battery installation shall be solid brick or cement wall with strong bearing capacity and wall thickness no less than 1...

Page 16: ...ced directly on the ground a fixed support must be used to fix the top of the battery box with the wall 3 4 holes with diameter of 10mm shall be opened on the wall with electric drill according to the marked position and the hole depth shall be greater than 70mm to fit the expansion bolts of M6 1 Draw the hole opening position of the screw on the wall with the positioning board supplied with the g...

Page 17: ...n screw 4 Installation procedure 4 Fix the expansion bolt M6 into the bottom of the hole on the wall 5 The bracket is fixed to the wall with M6 bolts to control the torque of 6NM 6 Carry the battery box to the installation site and put the battery to the wall of 15mm fixing the hanger and the upper part of the battery box with M6 bolts ...

Page 18: ...ist the battery box to the installed bracket fixing the hanging and the upper part of the battery box with M6 bolts twisting force keeps 6NM 5 Fix the expansion bolt M6 into the bottom of the hole on the wall and fix upper bracket and bottom support plate on the wall with M6 bolts twisting force keeps 6NM 7 Carry or hoist the battery box to the installed bracket fixing the hanging and the upper pa...

Page 19: ...ty means that the cable is available After visual testing of power line is connected well the positive and negative poles of the battery shall be connected respectively to the positive and negative poles of the opposite terminal Connect the battery box to the ground cable Take out the M6 OT terminal and M6 bolts in the accessories package Ground the battery shell as shown below The sectional area ...

Page 20: ...can be directly inserted into the battery socket Power cable section 25mm2 POWERBOX INVERTER Battery Battery CAN RS485 Battery CAN RS485 Table 3 3 Battery Inverter power matching table CAN communication interface The battery is connected to the inverter Positive cable The battery is connected to the inverter Negative cable ...

Page 21: ...ve and negative pole of the inverter input interface and the battery output interface should be confirmed The red power line is connected to the positive pole and the black power line is connected to the negative pole Before connection it is necessary to confirm the charge and discharge parameters of the inverter interface Voltage and current should meet the requirements of table 2 2 battery perfo...

Page 22: ...20 Foot position Color Definition PIN1 Orange white 485A PIN2 Orange XGND PIN3 Green white 485B PIN4 Blue CANH PIN5 Blue white CANL PIN6 Green NC NULL PIN7 Brown white XIN PIN8 Brown NC NULL ...

Page 23: ...D light is on and 4 LED indicator light will turn on the green color after self check Note After pressing the power button if the battery status indicator on the front panel continues to be red please refer to the 4 2 Alarm description and processing If the failure cannot be eliminated please contact the dealer timely 3 Use the voltmeter to measure if the two circuit voltage of circuit breaker bat...

Page 24: ...take appropriate action 4 2 1 Alarm and countermeasure influence system output In the system if the fault of influence output occurs for a single battery please follow table 4 1 processing if output of fault appears such as over voltage charge over current under voltage protection high temp protection and other abnormalities Table 4 1 Main alarm and Protection Statue Alarm category Alarm indicatio...

Page 25: ... common faults Analysis and treatment of common faults in the Table 4 3 Table 4 3 Analysis and treatment of common faults Item Fault phenomenon Reason analysis Solution 1 The indicator does not respond after the power on Power switch is broken Check the power switch 2 No DC output Battery data status is abnormal The network management is connected to backstage supporter server to read the battery ...

Page 26: ...Jiangsu Daqin New Energy Tech Co Ltd Address 158 South Ji an Road Hi Tech District Yangzhou City Jiangsu Province China 211400 Email Sales dyness net Website www dyness net ...

Reviews: