3.1.5 Engineering coordination
Attention should be paid to the following items before construction:
⚫
Power line specification.
⚫
The power line specification shall meet the requirements of maximum discharge
current for each product
.
⚫
Mounting space and bearing capacity.
⚫
Make sure that the battery has enough room to install, and that the battery rack and
bracket have enough load capacity.
⚫
Wiring.
⚫
Make sure the power line and ground wire are reasonable. Not easy to short-circuit,
water and corrosion.
3.2 Equipment installation
The wall for battery installation shall be solid brick or cement wall with strong bearing capacity and
wall thickness no less than 100mm.
Mounting space requirements
:
Floor installation
Mounted on the wall installation
Table 3-2 Installation steps