12
3.1.4 Open the box to have inspection
⚫
When the equipment arrives at the installation site, loading and unloading should
be carried out according to the rules and regulations, so as to prevent from being
exposed to sun and rain.
⚫
Before unpacking, the total number of packages shall be indicated according to the
shipping list attached to each package, and the case shall be checked for good
condition.
⚫
In the process of unpacking, handle with care and protect the surface coating of the
object.
⚫
Open the package, the installation personnel should read the technical documents,
verify the list, according to the configuration table and packing list, ensure objects
are complete and intact, if the internal packing is damaged, should be examined and
recorded in detail.
Packing list is as follows:
Battery×1
Battery bracket ×1
Fixed support×2
M6 bolt ×8
fix battery bracket and fixed
support
Power cable ×2
connect battery with inverter
M6 3 sets of combined
screws x 1
Ground wire
Summary of Contents for Powebox F Series
Page 1: ...POWERBOX F User Manual ...