8.5 Running-in instructions
8.5.1 General
The following maintenance work must be performed when running
in new machines or overhauled engines.
8.5.2 After 25 operating hours
1.
Change the engine oil
Chapter 8.9.2 „Changing engine oil
and oil filter element“ on page 92
.
2.
Check the valve clearance, adjust if necessary
8.9.1 „Checking, adjusting the valve clearance“ on page 90
3.
Check engine and machine for leaks.
4.
Retighten the fastening screws on air filter, exhaust and other
attachment parts.
5.
Retighten the bolted connections on the machine.
6.
Check tension of V-belt, tighten if necessary
„Servicing the V-belt“ on page 87
.
7.
Check tension of toothed belt, tighten if necessary
8.8.3 „Servicing the toothed belt“ on page 87
Maintenance – Running-in instructions
DTR75
81
Summary of Contents for DTR75
Page 2: ...2 ...
Page 6: ...10 Disposal 117 10 1 Final shut down of machine 118 Table of contents DTR75 6 ...
Page 7: ...1 Introduction Introduction DTR75 7 ...
Page 11: ...2 Technical data Technical data DTR75 11 ...
Page 15: ...3 Concerning your safety Concerning your safety DTR75 15 ...
Page 43: ...4 Indicators and control elements Indicators and control elements DTR75 43 ...
Page 48: ...Indicators and control elements Engine DTR75 48 ...
Page 49: ...5 Checks prior to start up Checks prior to start up DTR75 49 ...
Page 57: ...6 Operation Operation DTR75 57 ...
Page 69: ...7 Loading transporting the machine Loading transporting the machine DTR75 69 ...
Page 74: ...Loading transporting the machine After transport DTR75 74 ...
Page 75: ...8 Maintenance Maintenance DTR75 75 ...
Page 107: ...6 Check the oil levels 7 Clean the machine thoroughly Maintenance As required DTR75 107 ...
Page 108: ...Maintenance As required DTR75 108 ...
Page 109: ...9 Troubleshooting Troubleshooting DTR75 109 ...
Page 117: ...10 Disposal Disposal DTR75 117 ...
Page 119: ......
Page 120: ......