8.2 Preparations/concluding work
Certain maintenance tasks require preparations and concluding
activities.
This includes e.g. opening and closing maintenance flaps and
maintenance doors as well as securing certain components.
After this work close all maintenance flaps and doors again and
return all components to their operating condition.
8.2.1 Opening the protection hood
1.
Unscrew the fastening screws left and right and fold the pro-
tection hood forward.
B-834-0249
Fig. 66
Maintenance – Preparations/concluding work
DTR75
77
Summary of Contents for DTR75
Page 2: ...2 ...
Page 6: ...10 Disposal 117 10 1 Final shut down of machine 118 Table of contents DTR75 6 ...
Page 7: ...1 Introduction Introduction DTR75 7 ...
Page 11: ...2 Technical data Technical data DTR75 11 ...
Page 15: ...3 Concerning your safety Concerning your safety DTR75 15 ...
Page 43: ...4 Indicators and control elements Indicators and control elements DTR75 43 ...
Page 48: ...Indicators and control elements Engine DTR75 48 ...
Page 49: ...5 Checks prior to start up Checks prior to start up DTR75 49 ...
Page 57: ...6 Operation Operation DTR75 57 ...
Page 69: ...7 Loading transporting the machine Loading transporting the machine DTR75 69 ...
Page 74: ...Loading transporting the machine After transport DTR75 74 ...
Page 75: ...8 Maintenance Maintenance DTR75 75 ...
Page 107: ...6 Check the oil levels 7 Clean the machine thoroughly Maintenance As required DTR75 107 ...
Page 108: ...Maintenance As required DTR75 108 ...
Page 109: ...9 Troubleshooting Troubleshooting DTR75 109 ...
Page 117: ...10 Disposal Disposal DTR75 117 ...
Page 119: ......
Page 120: ......