4.
Slightly loosen the fastening screws (1) on both sides.
5.
Pull the engine carrier forward, remove and replace the V-
belt.
6.
Install the new V-belt and pull the engine carrier back.
7.
Tighten the fastening screws (1) on both sides.
8.
Check tension of V-belt, tighten if necessary.
ð
Compression measurement:
5 - 10 mm (0.2 - 0.4 in).
9.
Assemble the V-belt guard (1) with fastening screws (2).
10.
Check the V-belt tension again after 25 operating hours,
tighten if necessary.
8.7.4.1
Checking the frequency of the base plate
Keep feet and hands clear of the vibrating base plate.
1
B-230-0029
Fig. 73
1
B-230-0030
Fig. 74
Fig. 75
1
2
B-230-0124
Fig. 76
Maintenance – Annually
DFP12D
81
Summary of Contents for DFP12D
Page 2: ...2...
Page 6: ...Table of contents DFP12D 6...
Page 7: ...1 Introduction Introduction DFP12D 7...
Page 11: ...2 Technical data Technical data DFP12D 11...
Page 15: ...3 Concerning your safety Concerning your safety DFP12D 15...
Page 35: ...Brief operating instructions Fig 15 Concerning your safety Signage DFP12D 35...
Page 37: ...4 Indicators and control elements Indicators and control elements DFP12D 37...
Page 42: ...Indicators and control elements Transport wheels DFP12D 42...
Page 43: ...5 Checks prior to start up Checks prior to start up DFP12D 43...
Page 50: ...Checks prior to start up Checking the water level topping up DFP12D 50...
Page 51: ...6 Operation Operation DFP12D 51...
Page 59: ...7 Loading transporting the machine Loading transporting the machine DFP12D 59...
Page 64: ...Loading transporting the machine Transport wheels DFP12D 64...
Page 65: ...8 Maintenance Maintenance DFP12D 65...
Page 90: ...Maintenance As required DFP12D 90...
Page 91: ...9 Troubleshooting Troubleshooting DFP12D 91...
Page 95: ...10 Disposal Disposal DFP12D 95...
Page 97: ......
Page 98: ......