8.4 Running-in instructions
8.4.1 General
The following maintenance work must be performed when running
in new machines or overhauled engines.
8.4.2 After 25 operating hours
1.
Change the engine oil.
2.
Check the valve clearance, adjust if necessary
8.7.2 „Checking, adjusting the valve clearance“ on page 77
3.
Check engine and machine for leaks.
4.
Retighten the fastening screws on air filter, exhaust and other
attachments.
5.
Retighten the bolted connections on the machine.
6.
Check the V-belt.
7.
Check the oil level in the exciter shaft housing.
Maintenance – Running-in instructions
DFP12D
70
Summary of Contents for DFP12D
Page 2: ...2...
Page 6: ...Table of contents DFP12D 6...
Page 7: ...1 Introduction Introduction DFP12D 7...
Page 11: ...2 Technical data Technical data DFP12D 11...
Page 15: ...3 Concerning your safety Concerning your safety DFP12D 15...
Page 35: ...Brief operating instructions Fig 15 Concerning your safety Signage DFP12D 35...
Page 37: ...4 Indicators and control elements Indicators and control elements DFP12D 37...
Page 42: ...Indicators and control elements Transport wheels DFP12D 42...
Page 43: ...5 Checks prior to start up Checks prior to start up DFP12D 43...
Page 50: ...Checks prior to start up Checking the water level topping up DFP12D 50...
Page 51: ...6 Operation Operation DFP12D 51...
Page 59: ...7 Loading transporting the machine Loading transporting the machine DFP12D 59...
Page 64: ...Loading transporting the machine Transport wheels DFP12D 64...
Page 65: ...8 Maintenance Maintenance DFP12D 65...
Page 90: ...Maintenance As required DFP12D 90...
Page 91: ...9 Troubleshooting Troubleshooting DFP12D 91...
Page 95: ...10 Disposal Disposal DFP12D 95...
Page 97: ......
Page 98: ......