Operation
4812158801_E.pdf
2018-04-03
Operation
Before starting
Master switch - Switching on
Fig. Battery master switch
1. Key knob
1
Remember to carry out daily maintenance. Refer to
the maintenance instructions.
The battery master switch is located on the left side of
the machine. Turn the key knob (1) to the on position.
The entire roller is now supplied with power.
Water tanks - Level
Fig. Water tank
1. Level gauge
1
When driving on asphalt, check that the water tanks
are filled. See the relevant level gauges (1).
Control table - Setting
Fig. Control table
1. Locking pedal
1
Depress the control table's locking pedal (1) and set it
to the desired position. Release the pedal and check
that the control table is locked in position before
driving.
The mchine can only be controlled from the seat
that the control table is turned to, otherwise the
Interlock function is activated when the parking
brake is released.
39
Summary of Contents for CC7200
Page 2: ......
Page 12: ...Introduction 4812158801_E pdf 2018 04 03 4...
Page 18: ...Safety Optional 4812158801_E pdf 2018 04 03 10...
Page 22: ...Special instructions 4812158801_E pdf 2018 04 03 14...
Page 66: ...Operating instructions Summary 4812158801_E pdf 2018 04 03 58...
Page 68: ...Preventive maintenance 4812158801_E pdf 2018 04 03 60...
Page 76: ...Maintenance Maintenance schedule 4812158801_E pdf 2018 04 03 68...
Page 88: ...Maintenance 50h 4812158801_E pdf 2018 04 03 80...
Page 101: ...Dynapac Compaction Equipment AB Box 504 SE 371 23 Karlskrona Sweden www dynapac com...